Payneham Swimming Centre

“This cutting-edge aquatic center will serve as the centrepiece of a vibrant new community precinct, offering spaces designed to foster health, recreation, and social connection.”

“The complex structure demanded a ground-breaking approach to optimize every component and ensure a smooth assembly process. Our efforts centered on precisely engineered connections, enabling factory pre-assembly and efficient on-site installation. This approach reduced the required lifts by nearly 90% and halved the anticipated on-site assembly time.”

CREDITS

Builder: BADGE Constructions

Structural Engineer and Construction Engineering: WGA

Architect: dwp - design worldwide partnership

Steel Fabricator and Installer: Officine Muzza

Timber Manufacturer: Mozzone Building System

Timber Supplier: Theca Timber

Timber Installer: Capstone

Timber Engineering: Holzpak