Metro Martin Place

North Tower - Forum Stairs

“The Forum, centrally located within the multi-level atrium space, it integrates functionality and social interaction, acting as both a circulation element and a tiered seating space for informal meetings, presentations, or collaborative gatherings.

The Forum visually connects the upper floors to the lower atrium; it acts as a focal point, encouraging vertical circulation while creating opportunities for the users to pause, interact, or observe”. 

“The systems have been developed to maximise prefabrication to reduce onsite work. Brackets and cleats have been setout and welded in a factory environment to ensure precision and safety while kit of assemblies have been transported to site and installation guided through an hybrid of digital and analog processes.

The result is a de-risked, hassel-free, high quality delivery on time and on budget.”

CREDITS

Client: Macquarie Group

Main Contractor: Lendlease

Architects: Cox Architecture, Grimshaw

Base Building Architects: JPW

Fit-out Architects: Architectus

Structural Engineer: Arup

Subcontractor: F&P Normoyle

Digital Planner, Digital Fabricator: ENCODE